Redevelopment of the generating station. As this site is known as the cradle of Canadian history requiring the conservation of existing buildings, the project presented a variety of challenges, such as blasting sequences, noise levels and seismic monitoring.

  • Site preparation and visitor installations.
  • Cofferdam Design and Construction.
  • Channel Excavation and Channel Wall Construction.
  • Blasting and Rock Excavation.
  • Concrete Demolition and Disposal of Demolished and Excavated Materials.
  • Powerhouse Construction and Sequencing.
  • Downstream Rock Plug Removal.

Features

  • Activity Sector Energy
  • Client Energy Ottawa
  • Year 2015-2017
  • Value $101,000,000
  • Engineers Hatch
  • Other Stakeholders Northech Construction
Place