Highways 15 & 640 Interchange| Phase 4
EBC, in partnership with Demix, was entrusted with the last phase of the 15-640 interchange reconstruction project. Managing the exceptionally complex high traffic hub and coordinating the various parties to Phase 4 and earlier phases of the project was a challenge. The project included:
- Widening Highway 640 from two lanes to three lanes over a distance of 1.7 km
- Redevelopment of new ramps of Highways 640 East and West connecting Highway 15 South
- Reconstruction of overpass bridges over Sanche boulevard and Turgeon Street
- Reconstruction of Road 344 and Highway 15 overpass bridges
- Refurbishment of Desjardins and Faubourg boulevards and construction of a bicycle path
- Paving and refurbishment of Gédéon-Ouimet bridge slab
Features
- Client Ministère des Transports du Québec (MTQ)
- Year 2012-2014
- Value $84,000,000
- Realisation Mode General Contractor
Place