Project
La Romaine-2 | Dam & Dikes A2, B2, C2
- Construction of a dam (4,575,000 m3 of fill) and dikes A2, B2 and C2.
- Excavation of the spillway and quarry exploitation in a total volume of ± 3,000,000 m3 excavated rock blasted.
- Excavation of the spillway, phase 2.
- Construction of temporary and permanent roads.
- Stacking of calibrated materials and construction of a permanent 34.5 kV power line.
- Development of quarries, deposits and borrow pit.
Features
- Activity Sector Energy
- Client Hydro-Québec
- Year 2011-2013
- Value $105,900,000