La Romaine-2 | Dam & Dikes A2, B2, C2

  • Construction of a dam (4,575,000 m3 of fill) and dikes A2, B2 and C2.
  • Excavation of the spillway and quarry exploitation in a total volume of ± 3,000,000 m3 excavated rock blasted.
  • Excavation of the spillway, phase 2.
  • Construction of temporary and permanent roads.
  • Stacking of calibrated materials and construction of a permanent 34.5 kV power line.
  • Development of quarries, deposits and borrow pit.

Features

  • Activity Sector Energy
  • Client Hydro-Québec
  • Year 2011-2013
  • Value $105,900,000