Project
Centre of Excellence for Cellular Therapy (CECT)
- Construction of a 2 storey building (with a basement) in concrete structure relying 2 existing hospital pavilions.
- Building with an area of ± 3,200 sq. metre with an interstitial floor between the ground floor and level 1.
- Building made of steel structure used to ease equipment maintenance.
- Implementation of 97 piles while maintaining hospital pavilion operations.
- Siding in aluminum and metal.
- Many special features to seal electromechanical equipments with finished walls and ceilings.
Features
- Activity Sector Institutional
- Client Maisonneuve-Rosemont Hospital
- Year 2010-2012
- Value $11,000,000
- Engineers GENIVAR / Aecom Tecsult Teknika HBA
- Architect Jodoin Lamarre Pratte et Ass./NFOE et Ass./Corriveau Girard
- Realisation Mode General Contractor