Des Quinze Dam – Lot 2
- Modernization of sluices.
- Demolition and reconstruction of pillars.
- Discharge carriers and apron.
- Altering approaches to the bridge, injection, underwater works, blasting, rockfill, surface excavation, concrete works and riprap on the upstream and downstream faces of the 2 dams.
- Installation of a control building for the spillway gates was also included.
Features
- Activity Sector Energy
- Client MDDELCC / CEHQ
- Year 2013-2018
- Value $79,000,000
- Engineers BPR-Tetratech
- Realisation Mode General Contractor