Project
Share the project

Des Quinze Dam – Lot 2

  • Modernization of sluices.
  • Demolition and reconstruction of pillars.
  • Discharge carriers and apron.
  • Altering approaches to the bridge, injection, underwater works, blasting, rockfill, surface excavation, concrete works and riprap on the upstream and downstream faces of the 2 dams.
  • Installation of a control building for the spillway gates was also included.

Features

  • Activity Sector Energy
  • Client MDDELCC / CEHQ
  • Year 2013-2018
  • Value $79,000,000
  • Engineers BPR-Tetratech
  • Realisation Mode General Contractor