Long Lake Hydroelectric Project | 31 MW
- Construction of a rock-filled dam at the head of Long Lake hydroelectric project which can hold up to 30 million cubic meters of water.
- Construction of the intake, the spillway, the widening of an existing 68 m tunnel, 7 km of penstock 1.35 m Ø.
- Construction of a power station for the 2 Pelton turbines and 10 km of 138 KV transmission line.
Features
- Activity Sector Energy
- Client Regional Power
- Year 2011-2013
- Value $77,000,000
- Other Stakeholders Neilson Inc / WVCC