Peribonka Hydroelectric Power Plant | 405 MW
- Construction of a temporary diversion.
- Excavation of the access tunnel - Phase 1.
- Excavation and concreting of the powerhouse and spillway concrete works.
- The Peribonka power plant is equipped with 3 Francis units.
Features
- Activity Sector Energy
- Client Hydro-Québec
- Year 2004-2007
- Value $100,000,000
- Engineers Tecsult inc.
- Other Stakeholders Neilson Inc.